
2022 C_TS422_2020 Question Bank: Free PDF Download Recently Updated Questions
C_TS422_2020 Certification Exam Dumps with 150 Practice Test Questions
SAP C_TS422_2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Process Orders in SAP S/4HANA | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
NEW QUESTION 61
In Demand-Driven Replenishment, materials are classified according to several criteri a. What criteria can you use?
There are 3 correct answers to this question
- A. Usage in bill of materials
- B. Goods issue value
- C. Minimum order quantity
- D. Demand variation
- E. Average daily usage
Answer: A,B,D
NEW QUESTION 62
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.
- A. Automatic update of story boards
- B. Real time decision support
- C. Strategic analysis
- D. Comparison of current data with historical data to identify trends
Answer: B,C
NEW QUESTION 63
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Order type
- B. Requirements profile
- C. Consumption sequence procedure
- D. Requirements type
Answer: D
NEW QUESTION 64
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The cross-plant status
- B. The most restrictive status
- C. The plant-specific status
- D. The least restrictive status
Answer: B
NEW QUESTION 65
What is the difference between co-products and by-products?
- A. Only co-products are identified by a special item category in the bill of material (BOM).
- B. Only co-products appear in the processor production order settlement rule.
- C. Onlyco-products can be manufactured in isolation from the main product.
- D. Only by-products have a zero inventory valuation.
Answer: B
NEW QUESTION 66
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the totalproduction lead time for along production line
- C. To stage different components for a production line simultaneously
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 67
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. BOM, in the item for the material
- C. Material master of the finished product
- D. Work center, in the production supply area
Answer: B,D
NEW QUESTION 68
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the bill of materials (BOM)
- B. In the production version
- C. In the routing
- D. In the MRP controller
- E. In the production order type
Answer: C,D,E
NEW QUESTION 69
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.
- A. Reduction of associated capacity requirements
- B. Material staging for next order in sequence
- C. Archiving of documents for assembly scrap
- D. Posting of production costs to the production cost collector
- E. Posting of goods receipt for the product
Answer: A,D,E
NEW QUESTION 70
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirements date occurs before that of a firmed planned receipt
- B. The requirements date occurs that of a firmed planned receipt
- C. The requirement no longer exists
- D. A firmed planned receipt cannot be rescheduled
Answer: A
NEW QUESTION 71
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?
- A. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
- B. Enter the operation scrap and set the net indicator in the component of the bill of material of the assembly.
- C. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
- D. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where V Dthe component is used
Answer: D
NEW QUESTION 72
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When you create a sales order
- B. When you create a planned order
- C. When the MRP results are saved
- D. When you deliver a sales order
Answer: A
NEW QUESTION 73
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP controller.
- B. Use a specific MRP type.
- C. Use a specific material status.
- D. Use a specific material group
Answer: A,B
NEW QUESTION 74
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Cost-related
- B. Milestone-related
- C. Product-related
- D. Order-related
Answer: C,D
NEW QUESTION 75
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The lot size range must be within the lot-size range of the assigned routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must NOT have alternative sequences.
- E. The assigned routing must be a rate routing.
Answer: A,B,C
NEW QUESTION 76
Which data object can be updated with the scheduling results of a routing?
- A. Production version
- B. Production scheduling profile
- C. MRP profile
- D. Material master
Answer: D
NEW QUESTION 77
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
- A. Validity dates
- B. Task list group number
- C. BOM status
- D. Lot sizes
- E. Work center hierarchy
Answer: A,C,D
NEW QUESTION 78
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
- A. Stock transport order
- B. Production order
- C. Purchase requisition
- D. Scheduling agreement schedule line
- E. Planned order
Answer: C,D,E
NEW QUESTION 79
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Finite resource and finite strategy
- B. Infinite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and infinite strategy
Answer: A
NEW QUESTION 80
What is the purpose of collective orders?
- A. To post production costs ona cost collector instead of the production order
- B. To manage production orders for an entirefinished product on multiple levels
- C. To post any component withdrawals single back flush with order confirmation
- D. To combine order management of co-products and by-products with the main product
Answer: B
NEW QUESTION 81
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. Replenishments are created close to the actual need
- B. It is a simplified form of production control
- C. Replenishments are based on centralized planning
- D. It is mostly accomplished by manual postings
Answer: A,B
NEW QUESTION 82
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question.
- A. Building Blocks
- B. Scope Items
- C. Solution Package
- D. Process Flows
Answer: A,B,C
Explanation:
E, Test Scripts
NEW QUESTION 83
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
- A. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- B. Manually firm all planned orders for materials within the replenishment lead time of the material
- C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- D. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
Answer: A,B
NEW QUESTION 84
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A. Assign the alert profile to the overall profile.
- B. Create object selection variant for product-related alerts.
- C. Create object selection variant for resource-related alerts
- D. Assign the overall profile to the authorization profile.
- E. Create object selection variant for transportation lane-related alerts.
Answer: A,B,C
NEW QUESTION 85
......
New C_TS422_2020 Exam Dumps with High Passing Rate: https://www.exam4free.com/C_TS422_2020-valid-dumps.html
