
Unique Top-selling E_S4HCON2020 Exams - New 2021 SAP Pratice Exam
SAP Certified Technology Specialist Dumps E_S4HCON2020 Exam for Full Questions - Exam Study Guide
E_S4HCON2020 Exam Certification Details:
| Sample Questions: | SAP E_S4HCON2020 Exam Sample Question |
| Duration: | 90 mins |
| Exam: | 40 questions |
| Level: | Specialist |
| Languages: | English |
| Cut Score: | 68% |
NEW QUESTION 13
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Uptime migration (EU_CLONE_MIG_UT_RUN)
- B. Parallel distribution (PARDIST_SHD)
- C. Shadow repository creation (EU_IMPORT*)
- D. Downtime migration (EU_CLONE_MIG_DT_RUN)
Answer: A
NEW QUESTION 14
- A. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- B. The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.
Response: - C. SAP HANA Landscape Reorganization requires a manual step to edit a file.
- D. Network capacity between exporting and importing R3load processes must be considered.
- E. The target database size increases temporarily because of the Shadow Repository.
Answer: A,C
NEW QUESTION 15
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Activation of dictionary objects (ACT_UPG)
- B. Switch to new repository (EU_SWITCH)
- C. Conversion of application tables (PARCONVJJPG)
- D. Modification adjustment (SPDD)
Answer: A,D
NEW QUESTION 16
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
- A. Import of upgrade and language data from the download directory in phase TABIM UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- D. Import of dictionary objects from the download directory in phase DDIC_UPG
- E. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Answer: A,B,D
NEW QUESTION 17
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Generate it by analyzing the specific custom code via RFC
- B. Configure it within transaction ATC
- C. Download it from SAP Support Portal
- D. Apply the corresponding SAP note via SAP Note Assistant
Answer: C
NEW QUESTION 18
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. A
- B. DMO can only be run with systems NW740 or NW731
- C. Target DB size will increase temporarily
Answer: B,C
NEW QUESTION 19
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system.
What do you need to consider?
Please choose the correct answer.
Response:
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: C
NEW QUESTION 20
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. As part of the cleanup process
- B. Early in the downtime
- C. Before the downtime starts
- D. At the end of the downtime
Answer: C
NEW QUESTION 21
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file host_prose during registration
- B. The path is taken from the URL entered in the browser to start SUM
- C. The path was stored in file sumabap conf during registration
- D. The path was stored to the environment of user <sid>adm during registration
Answer: D
NEW QUESTION 22
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of SPDD modification adjustment
- B. Execution of SPAU modification adjustment
- C. Execution of XPRAs and AIMs
- D. Creation of the table structures in the new SAP HANA database
- E. Execution of eCATTs for business validation tests
Answer: B,C,E
NEW QUESTION 23
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To repeat specific phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To skip selected phases during the SUM run
Answer: C
NEW QUESTION 24
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU
& UC) procedure. - B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
Answer: B
NEW QUESTION 25
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
- A. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- B. A change of the database type is performed, without changing the software components.
- C. An upgrade of the software components is performed, without changing the database type.
- D. An SAP S/4HANA conversion is performed, without adapting the customer data.
Answer: B
NEW QUESTION 26
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- B. The SAP Support Packages contained in the upgrade media
- C. The SAP Support Packages found in the download directory
- D. The SAP Support Packages that will be bound to the upgrade
Answer: C
NEW QUESTION 27
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Parameter file SAPup_add.par
- B. MIGRATE J5T_DUR_XML file from a previous run
- C. Stack XML file calculated by the Maintenance Planner
- D. Breakpoint configuration file SAPUPPHAS.BRK
Answer: B,C
NEW QUESTION 28
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Uninstall industry extensions not supported by SAP S/4HANA
- C. Uninstall Fiori apps not released for SAP_UI 7.50
- D. Delete client 066 (Early Watch Client)
Answer: C,D
NEW QUESTION 29
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase DOWNCONF_DTTRANS
- B. Phases DIFF*
- C. Phases EU_IMPORT*
- D. Phase RUN_RSPTBFIL _ISUTABU
- E. Phase RUN_RSDBSCPY
Answer: A,B,C
NEW QUESTION 30
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: C
NEW QUESTION 31
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. As part of the cleanup process
- B. Early in the downtime
- C. Before the downtime starts
- D. At the end of the downtime
Answer: C
NEW QUESTION 32
......
Best way to practice test for SAP E_S4HCON2020: https://www.exam4free.com/E_S4HCON2020-valid-dumps.html
