
2023 Valid HQT-4180 Real Exam Questions, practice Hitachi Vantara Qualified Professional
Latest Success Metrics For Actual HQT-4180 Exam (Updated 37 Questions)
NEW QUESTION # 20
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?
- A. IP addresses of all the ports and of the SVP
- B. IP addresses of management ports
- C. IP addresses of all the ports
- D. IP addresses of maintenance ports
Answer: B
NEW QUESTION # 21
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?
- A. Hitachi Ops Center Protector
- B. Storage Navigator
- C. Hitachi Remote Ops SVP Agent
- D. Hitachi Remote Ops Monitor Agent
Answer: A
NEW QUESTION # 22
Which program is used to perform the "New Installation" procedure on a VSP F700 system?
- A. Hitachi Ops Center Administrator
- B. raidcom CLI
- C. SVP Web console
- D. MPC connected to the maintenance LAN port
Answer: A
NEW QUESTION # 23
Which manual should be used when performing maintenance actions on VSP midrange storage systems?
- A. Product Documentation Library
- B. Service Guide
- C. Administrator Guide
- D. Maintenance Manual
Answer: D
NEW QUESTION # 24
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)
- A. The Universal Volume Manager license must be installed.
- B. Two cache partitions must be created on the VSP for the servers.
- C. Port security must be enabled on both ports.
- D. Both servers must be registered in two different Host Groups.
Answer: C,D
NEW QUESTION # 25
Which program is used to perform the "New Installation" procedure on a VSP midrange system?
- A. GUM
- B. MPC
- C. Webconsole
- D. BECK
Answer: A
NEW QUESTION # 26
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
- A. The RAID Group must be deleted.
- B. The RAID 5 Group must be put into DRU mode in Storage Navigator.
- C. The RAID level must be changed in the SVP Maintenance window.
- D. The RAID level must be changed in Storage Navigator.
Answer: C
NEW QUESTION # 27
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
- A. The RAID 5 group must be put into DRU mode in Storage Navigator.
- B. The RAID level in the SVP Maintenance window must be changed.
- C. Parity groups must be deleted.
- D. The RAID level must be changed in Storage Navigator.
Answer: C
NEW QUESTION # 28
Which tool can be used to change System Option Modes (SOMs)?
- A. Hitachi Ops Center
- B. Webconsole
- C. HSAe
- D. MPC software
Answer: D
NEW QUESTION # 29
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
- A. Use the Maintenance Utility for blocking the controller, then replace the PS.
- B. Use the Maintenance Utility for blocking the PS, then replace it.
- C. Check if the status of the PS is blocked, and if yes, then replace it directly.
- D. Use the MPC for blocking the PS, then replace it.
Answer: D
NEW QUESTION # 30
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?
- A. 2.99 TB
- B. 1 TB
- C. 65 TB
- D. 128 TB
Answer: A
NEW QUESTION # 31
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)
- A. The license keys are deleted.
- B. The SVP drive is formatted.
- C. The MPC software is updated.
- D. All the data on RAID groups is lost.
Answer: B,D
NEW QUESTION # 32
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
- A. Create a Host Group.
- B. Enable Host Group security.
- C. Scan for all WWNs.
- D. Enable Port Security.
Answer: C
NEW QUESTION # 33
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)
- A. The CHBs must be updated first.
- B. The Cache Write Pending rate should be below 30%.
- C. The Microprocessor utilization should be below 50%.
- D. There should be no sparing processes running in the background.
Answer: A,D
NEW QUESTION # 34
......
Genuine HQT-4180 Exam Dumps Free Demo Valid QA's: https://www.exam4free.com/HQT-4180-valid-dumps.html
Printable & Easy to Use Hitachi Vantara Qualified Professional HQT-4180 Dumps 100% Same Q&A In Your Real Exam: https://drive.google.com/open?id=1ZGPw_HGnUGdOdMfhoeDRGpxW1b1o9O89
