2023 Valid HQT-4180 Real Exam Questions, practice Hitachi Vantara Qualified Professional Latest Success Metrics For Actual HQT-4180 Exam (Updated 37 Questions) NEW QUESTION # 20 You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.Which set of IP addresses is configured with the ISW? A. IP addresses of all the ports and of the SVP B. IP addresses [...]

2023 Valid HQT-4180 Real Exam Questions, practice Hitachi Vantara Qualified Professional [Q20-Q42]

Share

2023 Valid HQT-4180 Real Exam Questions, practice Hitachi Vantara Qualified Professional

Latest Success Metrics For Actual HQT-4180 Exam (Updated 37 Questions)

NEW QUESTION # 20
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?

  • A. IP addresses of all the ports and of the SVP
  • B. IP addresses of management ports
  • C. IP addresses of all the ports
  • D. IP addresses of maintenance ports

Answer: B


NEW QUESTION # 21
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?

  • A. Hitachi Ops Center Protector
  • B. Storage Navigator
  • C. Hitachi Remote Ops SVP Agent
  • D. Hitachi Remote Ops Monitor Agent

Answer: A


NEW QUESTION # 22
Which program is used to perform the "New Installation" procedure on a VSP F700 system?

  • A. Hitachi Ops Center Administrator
  • B. raidcom CLI
  • C. SVP Web console
  • D. MPC connected to the maintenance LAN port

Answer: A


NEW QUESTION # 23
Which manual should be used when performing maintenance actions on VSP midrange storage systems?

  • A. Product Documentation Library
  • B. Service Guide
  • C. Administrator Guide
  • D. Maintenance Manual

Answer: D


NEW QUESTION # 24
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)

  • A. The Universal Volume Manager license must be installed.
  • B. Two cache partitions must be created on the VSP for the servers.
  • C. Port security must be enabled on both ports.
  • D. Both servers must be registered in two different Host Groups.

Answer: C,D


NEW QUESTION # 25
Which program is used to perform the "New Installation" procedure on a VSP midrange system?

  • A. GUM
  • B. MPC
  • C. Webconsole
  • D. BECK

Answer: A


NEW QUESTION # 26
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

  • A. The RAID Group must be deleted.
  • B. The RAID 5 Group must be put into DRU mode in Storage Navigator.
  • C. The RAID level must be changed in the SVP Maintenance window.
  • D. The RAID level must be changed in Storage Navigator.

Answer: C


NEW QUESTION # 27
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

  • A. The RAID 5 group must be put into DRU mode in Storage Navigator.
  • B. The RAID level in the SVP Maintenance window must be changed.
  • C. Parity groups must be deleted.
  • D. The RAID level must be changed in Storage Navigator.

Answer: C


NEW QUESTION # 28
Which tool can be used to change System Option Modes (SOMs)?

  • A. Hitachi Ops Center
  • B. Webconsole
  • C. HSAe
  • D. MPC software

Answer: D


NEW QUESTION # 29
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

  • A. Use the Maintenance Utility for blocking the controller, then replace the PS.
  • B. Use the Maintenance Utility for blocking the PS, then replace it.
  • C. Check if the status of the PS is blocked, and if yes, then replace it directly.
  • D. Use the MPC for blocking the PS, then replace it.

Answer: D


NEW QUESTION # 30
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

  • A. 2.99 TB
  • B. 1 TB
  • C. 65 TB
  • D. 128 TB

Answer: A


NEW QUESTION # 31
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)

  • A. The license keys are deleted.
  • B. The SVP drive is formatted.
  • C. The MPC software is updated.
  • D. All the data on RAID groups is lost.

Answer: B,D


NEW QUESTION # 32
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  • A. Create a Host Group.
  • B. Enable Host Group security.
  • C. Scan for all WWNs.
  • D. Enable Port Security.

Answer: C


NEW QUESTION # 33
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)

  • A. The CHBs must be updated first.
  • B. The Cache Write Pending rate should be below 30%.
  • C. The Microprocessor utilization should be below 50%.
  • D. There should be no sparing processes running in the background.

Answer: A,D


NEW QUESTION # 34
......

Genuine HQT-4180 Exam Dumps Free Demo Valid QA's: https://www.exam4free.com/HQT-4180-valid-dumps.html

Printable & Easy to Use Hitachi Vantara Qualified Professional HQT-4180 Dumps 100% Same Q&A In Your Real Exam: https://drive.google.com/open?id=1ZGPw_HGnUGdOdMfhoeDRGpxW1b1o9O89